Today is July 10, 2020
Login:
Password:
new sign-up  


Recommended Links

Email Developer at:
webmasterphilcoastal.net
Copyright © 2020
Philippine Coastal Storage & Pipeline Corporation.
All rights reserved.




Back to News

New Barge Loading Facility

Posted on: December 15, 2013 14:52 PM

Subic Bay Freeport Zone – On Dec. 15, 2013, PCSPC received formal turn-over from its contractor of a newly constructed barge loading facility with an overall length of 200 meters designed to cater for smaller vessels ranging from 500 to 6,400 DWT.  The new jetty is supported by seven mooring dolphins and is equipped with state of the art marine loading arm produced and manufactured in Germany by EMCO WHEATON® and Rubber Fender System from TRELLEBORG®.

 

 

The new jetty is currently being outfitted with pipes for receiving and discharging of petroleum products to and from storage tanks situated inside Boton Tank Farm, SBFZ which is scheduled to be completed by end of February 2014.